Office

A comfortable, productive environment is crucial for businesses of all types and sizes. Hundreds of commercial office projects have given Geauga Mechanical the experience and expertise to understand your unique needs and offer the right solutions for your project. We provide cost effective, energy-efficient systems to increase productivity for everyone—including your building.

CrossCountry Mortgage

  • Cleveland, Ohio

CrossCountry Mortgage, one of the nation's largest and fastest growing retail mortgage lenders, constructed a 168,000-square-foot corporate campus in Cleveland's historic Superior Arts District. The HVAC system included 85,000 lbs. of Ductwork, 11 Packaged Rooftop Units, 111 Variable Air Volume Boxes, and 750 pieces of Air Distribution.

    CrossCountyMortgage cafeteria

    Flexjet

    • Richmond Heights, OH

    New Headquarters and Operation Center for Flexjet located at the Cuyahoga County Airport. The Water Source Heat Pump system included 33,000 lbs. of Ductwork, 55 Water Source Heat Pumps, 2 DOAS Units, a Cooling Tower, and 2 Boilers.

      Flexjet Projects exterior building

      Cleveland Foundation

      • Cleveland, Ohio

      New 80,000 square foot headquarters for the Cleveland Foundation in Midtown. This mass timber framed building includes a public lobby, interactive art space, public cafe, conference rooms, multipurpose rooms, offices, and event spaces. The HVAC system included 30,000 lbs. of Ductwork, 2 DOAS Units, a Variable Refrigerant Volume system with 62 Indoor Units, and a Hot Water Heating system.

        Cleveland Foundation projects

        Cleveland Clinic Foundation Business Operations Center

        • Independence, Ohio

        This 137,000 square foot addition to the old Republic Steel building is the home to over 600 Cleveland Clinic employees. Geauga Mechanical worked closely with the owner and design team to select an efficient and cost effective HVAC system.

        • LEED Certified Project
        • Design/Build Project
        Exterior of Commercial Building

        WEWS NewsChannel 5

        • Cleveland, Ohio

        This design/build project was a complete replacement of the HVAC systems in the WEWS Building. The facility includes 2 TV studios, a newsroom, control rooms, and offices. Careful coordination was required to ensure the facility could remain in operation during the renovation.

        • Design/Build Project
        Cleveland News Channel 5 Office Building Interior

        Cleveland Foundation

        New Headquarters

        CrossCountry Mortgage

        New Headquarters

        COhatch Beachwood

        Coworking and Restaurant

        Progressive Insurance

        Omega North

        Olympic St Vladamir

        Cleveland

        PBGC Euclid Satellite Office

        Euclid

        Global X

        2nd Floor

        The Fives

        Department of Health and Lobby Renovation

        Boyd Watterson

        Tenant Improvements